RECEIVING THE PRODUCT AND STORAGE

3.1 Reception

On receiving the unit, check that it is undamaged, bearing in mind that it left the factory in perfect condition.
Report any signs of damage immediately to the transporter and make a note of these on the Delivery Sheet before
signing it.
The relevant sales department or the manufacturer should be informed of the extent of the damage as soon as
possible.
The Customer must draw up a written and photographic report concerning any and all significant damage.
Disposal of the packing material is the responsibility of the consignee and must be carried out in compliance with the
regulations in force in the country in which it is carried out.

3.2 Transport

The unit is sent from the warehouse using suitable vehicles, with correct clamping in order to prevent any possibility
of movement whilst in transit by road that may damage it or cause accidents.
If there is to be trans-shipment to other vehicles to continue the journey, it is essential to adopt all necessary measures
for ensuring the correct safety conditions, with regard to the vehicles used and the anchorage, in order to prevent
damage.
If the unit is to be transported over uneven roads, the manufacturer must be informed beforehand so that suitable
measures can be taken in order to prevent damage to the unit.
If it is to be transported by container, make sure it is correctly anchored.

3.3 Handling

Before each unit handling operation, check that the lifting capacity of the machinery used is compatible with the
weight of the unit.
Handling must be carried out by adequately equipped qualified personnel.
In all lifting operations, make sure the unit is firmly secured in order to prevent accidental falls or
overturning.
Lifting must be carried out by qualified and authorised personnel taking the necessary precautions; if
carried out incorrectly, lifting can cause serious damage and physical injury.
The handling operations must be carried out slowly and sudden manoeuvres and knocks must be
avoided.
Do not, under any circumstances, stand or pass under or near the unit when it is lifted off the ground.
Use only the lifting system designed and prepared for the unit.
During unloading and positioning of the unit, great care must be taken to prevent sudden or violent manoeuvres, and
the components of the unit must not be used as lifting points.
Make sure the machinery and lifting ropes are of suitable size and capacity and strictly follow their operating
instructions. Use only equipment that is in excellent working order.
All work on the unit, including unpacking and connections, must be carried out with the unit resting on the ground.
Refer, in any case, to the lifting instructions provided with the unit.
We reserve the right to make changes without any prior notice.
UATYQ*Y1
Packaged Rooftop
4P522680-1
Translation from original instructions
Installation manual
13

Advertisement

Table of Contents
loading

Table of Contents