Prepare Boiler - Convert For Propane - Weil-McLain ULTRA299-S4 Manual

Gas-fired water boilers
Table of Contents

Advertisement

S
4
®
ERIES
Prepare boiler — convert for propane
Prepa re boiler for propane
(when required)
Propane operation
have suffi x "LP" after the model number. All
other boilers require conversion for propane
operation.
natural gas boilers require installation
of a burner in addition to an orifi ce change.
use the instructions in this manual
for these boilers. Use only the instructions
included in the special-order conversion kits.
installed, you must turn off gas supply, turn
off power and allow boiler to cool before
proceeding. You must also completely test the
boiler after conversion to verify performance
and start up the boiler following instructions
beginning on page 35 of this manual.
lations more than 5,500 feet above sea level,
obtain the high altitude propane orifi ce kit..
when installing that the orifi ce size marking
matches boiler size. Use only the special-order
feet.
–– Sea level (to 5,500 feet), Part number 540-
202-833, Assembly Bag Orifi ce Gas Ult 310
Canada supplied with boiler.
–– High altitude (above 5,500 feet), Part num-
ber 383-500-648, Kit Conversion Liquefi ed
Petroleum (Propane) Gas Ultra 310 - special
order.
Failure to comply could result in severe per-
sonal injury, death or substantial property
damage.
48
-
GAS
FIRED WATER BOILER
. Propane-ready boilers
— For a boiler already
— For instal-
— See Figure 43 . Verify
orifi ce for altitudes above 5,500
— Boiler Manual
Installing propane orifi ce
off electrical supply to the boiler and close the
external manual gas shut-off valve to isolate the
boiler during conversion. Allow the boiler to cool
if it has been operating. Following conversion of
an installed boiler, follow all instructions in this
manual to start up the boiler and verify operation
of the boiler and all system components.
1. Locate propane orifi ce disc from conversion kit bag.
2. Verify that the stamping on the orifi ce disk matches the model
size (see Figure 43 ).
3. With the new boiler on its back, remove jacket front door by
removing two (2) screws at lower front.
Orifi ce identifi cation
Installing propane orifi ce
(Ultra-105 or Ultra-80LP ONLY)
— You must turn
Part number 550-100-400/0717

Advertisement

Table of Contents
loading

This manual is also suitable for:

4 seriesUltra230-s4

Table of Contents