Part 5 - Venting; Intake Pipe And Exhaust Vent Guidelines - Westinghouse WBRU 80W Series Installation, Start-Up And Maintenance Instructions

Universal fire tube boiler
Hide thumbs Also See for WBRU 80W Series:
Table of Contents

Advertisement

Figure 5 – Wall Mounting the Boiler
PART 5 – VENTING
Vent this boiler in accordance with these instructions. Failure to do so will result in property damage, severe personal injury, or death.
DO NOT mix vent systems or materials unless specifically told to do so in this manual.
DO NOT thermally insulate the exhaust vent or intake pipes.
DO NOT use an electric damper, vent damper, or draft hood with this boiler.
DO NOT locate the exhaust vent or intake pipe terminations where exposed to prevailing winds.
Moisture will be produced by the exhaust vent. Take precautions when determining exhaust vent termination. Moisture may fall from the
vent termination to the ground and turn to ice in freezing conditions. Moisture or ice can produce a hazardous condition.
Exhaust condensate is acidic, and could deteriorate the surface below the exhaust vent termination. Ensure this surface is in good
repair (sealed, painted, etc.) to prevent deterioration.
Pitch the exhaust vent pipe ¼" back to the boiler. This ensures that condensate in the exhaust vent returns to the boiler and drains
properly.
Failure to follow these instructions could result in property damage, severe personal injury, or death.
A. INTAKE PIPE AND EXHAUST VENT GUIDELINES
1. Vent system must be installed in accordance with local codes, or, in absence of local codes, the National Fuel Gas Code, ANSI
Z223.1 / NFPA 54 and/or CSA B149.1, Natural Gas and Propane Installation Code.
2. For installation in Canada, installer supplied plastic vent piping must comply with CAN/CGA B149.1 and be certified to the
Standard for Type BH Gas Venting Systems, ULC-S636. Components of this listed system must not be interchanged with other vent
systems or unlisted pipes or fittings. All plastic components and specified primers and glues must be from a single system manufacturer
and must not be intermixed with another system manufacturer's products. Clean and dry all applicable surfaces before applying
cement.
3. This appliance is designed to be installed in a power vent (using indoor air for combustion and vented to the outdoors) type, or as a
direct vent (sealed combustion) type. In power vent installations, indoor air is used for combustion and exhaust gases are vented
directly to the outdoors through a sealed exhaust vent piped through the wall or roof. In direct vent installations, combustion air must be
supplied directly from the outdoors to the burner, and the flue (exhaust) gases should be vented directly to the outdoors through the
wall or roof.
4. This boiler uses 2" or 3" diameter pipe for exhaust vent and intake pipe. It is important to ensure an airtight seal from the boiler collar
to the vent terminations. See Table 9 for a list of Approved Vent Materials.
5. Do not install venting system components on the exterior of the building except as specifically required by these instructions.
Vent terminals must be at least 1 foot from any door, window, or gravity inlet into the building.
Maintain the correct clearance and orientation between the exhaust vent and intake pipe terminals.
The exhaust vent and air intake terminals must be at the same height and their center lines must be spaced apart 1 foot
minimum.
The bottom of the exhaust vent and intake pipe terminals must be at least 1 foot above the normal snow accumulation level. In
no case should these terminals be installed less than 1 foot above normal snow accumulation level.
Do not install the exhaust vent terminals directly above windows or doors.
20
WHL-032 REV. 6.2.16

Advertisement

Table of Contents
loading

Table of Contents