Before Initial Start-Up; Job Data Required; Equipment Required; Remove Shipping Packaging - Carrier AquaEdge 23XRV Start-Up, Operation And Maintenance Instructions Manual

High-efficiency variable speed screw chiller with greenspeed intelligence and pic6 controls
Table of Contents

Advertisement

BEFORE INITIAL START-UP

Job Data Required

list of applicable design temperatures and pressures (prod-
uct data submittal)
chiller certified prints
starting equipment details and wiring diagrams
diagrams and instructions for special controls or options
23XRV Installation Instructions
23XRV Start-up, Operations and Maintenance Instructions
pumpout unit instructions

Equipment Required

T30 hexalobular socket screw driver to remove control
center door shipping brackets
mechanic's tools (refrigeration)
digital volt-ohmmeter (DVM)
clamp-on ammeter
electronic leak detector
absolute pressure manometer
500-v insulation tester (megohmmeter) for compressor
motors with nameplate voltage of 600 v or less

Remove Shipping Packaging

Remove any packaging material from the unit and starter.

Open Oil Circuit Valves

Check to ensure the oil filter isolation valves (Fig. 13) are open by
removing the valve cap and checking the valve stem.
BOLT SIZE
(in.)
Minimum
1/4
5/16
3/8
7/16
1/2
9/16
5/8
3/4
105
7/8
140
1
210
1-1/8
330
1-1/4
460
1-3/8
620
1-1/2
740
1-5/8
1010
1-3/4
1320
1-7/8
1630
2
1900
2-1/4
2180
2-1/2
3070
2-3/4
5120
3
6620
Table 4 — Bolt Torque Requirements, Foot Pounds
SAE 2, A307 GR A
HEX HEAD
NO MARKS
LOW CARBON STEEL
Maximum
4
6
8
11
13
19
21
30
32
45
46
65
65
95
150
200
300
475
660
885
1060
1450
1890
2340
2720
3120
4380
7320
9460

Oil Charge

The oil charge for the 23XRV chiller is split between the cooler
and the oil vaporizer:
FRAME
COOLER
SIZE
CHARGE
A
B
1 gal.(3.8 L)
3
4
5
The chiller is shipped with its oil charge. The oil level in the va-
porizer will initially be in the center of the oil sump sight glass.
This level will vary depending on the amount of refrigerant that
has been absorbed by the oil and the operating conditions of the
chiller. Normal oil levels will vary from the top of the strainer
housing sight glass to above the top of the oil sump sight glass.
If oil is added, it must conform to Carrier's specification for screw
compressor use as described in the Oil Specification section.
Charge the oil through the oil charging valve located near the bot-
tom of the oil strainer housing. The oil must be pumped from the
oil container through the charging valve due to the higher refriger-
ant pressure. The pumping device must be able to lift from 0 to
200 psig (1379 kPa) or above unit pressure. Oil should only be
charged or removed when the chiller is shut down.

Tighten All Gasketed Joints

Gaskets normally relax by the time the chiller arrives at the job-
site. Tighten all gasketed joints to ensure a leak-tight chiller. See
Tables 4 and 5 for waterbox torque specifications.
SAE 5
SOCKET HEAD OR HEX
WITH 3 RADIAL LINES, OR SA499
MEDIUM CARBON STEEL
Minimum
Maximum
6
9
13
18
22
31
35
50
53
75
75
110
105
150
175
250
265
380
410
580
545
780
770
1,100
1,020
1,460
1,220
1,750
1,670
2,390
2,180
3,110
2,930
4,190
3,150
4,500
4,550
6,500
5,000
7,140
8,460
12,090
11,040
15,770
24
OIL SUMP
TOTAL
CHARGE
10.0 gal.
9.0 gal.(34.1 L)
(37.9 L)
SAE 8
HEX HEAD
WITH 6 RADIAL LINES OR
SA354 GR BD
MEDIUM CARBON STEEL
Minimum
Maximum
9
13
20
28
32
46
53
75
80
115
115
165
160
225
260
370
415
590
625
893
985
1,410
1,380
1,960
1,840
2,630
2,200
3,150
3,020
4,310
3,930
5,610
5,280
7,550
5,670
8,100
8,200
11,710
11,350
16,210
15,710
22,440
19,900
28,440

Advertisement

Table of Contents
loading

Table of Contents