Trane YSJ072A Installation, Operation And Maintenance Manual page 46

Packaged rooftop air conditioners precedent cooling and gas/ electric
Table of Contents

Advertisement

Installation
Table 9. Temperature vs. resistance
Temperature
Degrees °F
Degrees °C
-20
-28.9
-15
-26.1
-10
-23.3
-5
-20.6
0
-17.8
5
-15.0
10
-12.2
15
-9.4
20
-6.7
25
-3.8
30
-1.1
35
1.7
40°
4.4
45°
7.2
50°
10.0
55°
12.8
60°
15.6
65°
18.3
70°
21.1
75°
23.9
80°
26.7
85°
29.4
90°
32.2
95°
35.0
46
Nominal Resistance
(kOhms)
170.1
143.5
121.4
103.0
87.56
74.65
63.80
54.66
46.94
40.40
34.85
30.18
26.22
22.85
19.96
17.47
15.33
13.4
11.89
10.50
9.297
8.247
7.330
6.528
Table 10. Sizing natural gas pipe mains and branches
Iron Pipe Size (IPS) Inches
Length
½" Pipe
¾" Pipe
of Pipe
(Ft.)
15
76
176
30
52
120
45
43
99
60
38
86
75
-
77
Note: Capacity of Pipe of Different Diameters and Lengths in Cu. Meter
Per Hr. with Pressure Drop of 74.6 Pa and Specific Gravity of 0.60.
Table 11. Iron pipe size (SI) millimeters
Iron Pipe Size (SI) Millimeters
Length of
15 mm
20 mm
Pipe
Pipe
Pipe
(Meters)
4.6
2.15
4.98
9.1
1.47
3.39
13.7
1.21
2.80
18.3
1.07
2.43
22.9
2.18
Note: Capacity of Pipe of Different Diameters and Lengths in Cu. Meter Per Hr.
with Pressure Drop of 74.6 Pa and Specific Gravity of 0.60.
Figure 61. Schematic diagram for field gas piping to
Units
1" Pipe
1¼"
1½"
Pipe
Pipe
345
750
1220
241
535
850
199
435
700
173
380
610
155
345
545
25 mm
32 mm
40 mm
Pipe
Pipe
Pipe
9.76
21.23
34.54
6.82
15.14
24.06
5.63
12.31
19.82
4.89
10.76
17.27
4.38
9.76
15.40
RT-SVX071A-EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ysj300a

Table of Contents