Install The Server Onto The Inner Rails - IBM 3453-F7E Install Manual

Table of Contents

Advertisement

Repeat steps 1 and 2 to install the right rail to the opposite side of the rack.
If you want to ship the rack with the server installed or place the rack in a vibration-
prone area, install the M6 screws into the rear of the rails.
Figure 8: Shipping screw installation

Install the server onto the inner rails.

Step 1 Pull the rails forward until the inner rails click two times into place.
Step 2 Carefully lift the server and tilt it into position over the rails so that the
mounting studs on the server line up with the mounting holes in the inner rails.
Step 3 Slowly lower the server down until the rear mounting studs slide into the
rear mounting holes, and then the front mounting studs go into the corresponding
mounting holes in the rails. Ensure that the mounting studs are locked into
position so the server is firmly secured.
Caution: Ensure that two people are lifting the server together. Their hands must be
positioned as illustrated.