Panel Preparation-Close Mount; Conduit) - Trane AFDR Installation Instructions Manual

Table of Contents

Advertisement

Installation
Panel Preparation—Close Mount (Kit 1 — 2 conduit)
If using a remote mount or wall mount option with field-
provided power wire and conduit, skip to
Component Installation (All Kits)," p.
Refer to
Figure 36
during the following procedure.
1. Drill two 2.5-inch diameter holes at Location 2 and
Location 4, as shown in
used to route the power wire which connects the unit
to the AFD.
Notes:
Figure 36. Conduit hole locations
1
Note: See
"Dimensions," p. 9
dimensions.
36
"Panel
38.
Figure
36. These holes will be
2X Holes Drilled
2X Ø 2.5
Panel Bottom
2
for conduit location
Test-fit the 2.5-inch conduit fittings at the locations to
ensure the conduit and or fitting will not interfere with
the unit evaporator and or panel before drilling holes.
Depending on the unit's evaporator size the holes may
be located further inward than specified without
interference between conduit and evaporator.
Locating the holes further inward will aid in harness
installation later. Before drilling, make sure conduit
and fittings will not interfere with evaporator or panel
door.
Panel Front
AFDR-SVN001D-EN

Advertisement

Table of Contents
loading

Table of Contents