Work Procedures - Sega Transformers Human Alliance Owner's Manual

Table of Contents

Advertisement

7-2 Work Procedures:

1 After Opening package(Take care not to drop for Billboard and POP),
please assemble Billboard and POP together in advance.
The 2 pcs of metal( put in the coin box) locked false
by 4 pcs of screws(locked false on the Billboard)
2 After opening the side door of the LCD, install the Billboard assembly.
Locked tightly by 2 pcs of screws (put into the coin box),and then
connected by 2pcs of connector and locked tightly upside by 6 pcs of screws
(Please see the left picture in green and circle location in blue)
and last lock the backside door of the LCD.
Locked false by 2 pcs of screws
(Locked false on the machine)
http://op.sega.jp/op_e/
Locked by 4 pcs of
screws(the
screws
ocked false lon the
Billboard)
9