Download Print this page

Central Machinery 33497 Owner's Manual & Safety Instructions page 5

12 ton shop press

Advertisement

Assembly (continued)
6. Slide the Support Pins (11) into the holes in the
Frame Posts. Angle the Press Apron (10) so
the rails of the Press Apron straddle the Frame
Posts, then lower into place so the Press Apron
rests on the Support Pins. See Figure C.
Frame Post (15)
Figure C
Note: For set-up, position the Support Pins at
least several holes down from the top holes in
the Frame Posts so you have room to place
the Jack Plate (7). You can re-adjust the
placement of the Press Apron after assembly.
7. Insert the Eye Bolts (6) into the holes in
the Jack Plate and secure in place with
two M8 Nuts (8). See Figure D.
Eye Bolts (6)
Jack Plate (7)
M8 Nuts (8)
Figure D
Item 33497
Press Apron (10)
Support Pins (11)
For technical questions, please call 1-888-866-5797.
8. Place the Arbor Plates (9) on the Press Apron.
Angle the Jack Plate so the rails of the Jack Plate
straddle the Frame Posts, then lower into place
by sliding it down the Frame Posts so it rests
temporarily on the Arbor Plates. See Figure E.
Frame Post (15)
Figure E
9. Bleed the Bottle Jack and make sure
it is fully collapsed. Refer to Bleeding
the Bottle Jack on page 8.
Jack Plate (7)
Arbor
Plate
(9)
Page 5

Advertisement

loading