Equipment Warm-Up; Lmf Computer And Software - Motorola SC 4812T-MC Technical Information

Multicarrier bts optimization / atp

Advertisement

Required Test Equipment and Software
1
Equipment Warm–up

LMF Computer and Software

1-8
After arriving at the a site, the test equipment should be plugged in and
turned on to allow warm up and stabilization to occur for as long as
possible. The following pieces of test equipment must be warmed–up for
a minimum of 60 minutes prior to using for BTS optimization
procedures.
Communications Test Set
S
Power Meter
S
LMF Hardware Requirements
An LMF computer platform that meets the following requirements (or
better) is recommended:
Notebook computer
S
266 MHz (32–bit CPU) Pentium processor
S
MSr Windows 98R Second Edition (SE) or Windows 2000 operating
S
system
4 GB internal hard disk drive
S
SVGA 12.1–inch active matrix color display with 1024 x 768
S
(recommended) or 800 x 600 pixel resolution and capability to display
more than 265 colors
NOTE
If 800 x 600 pixel resolution is used, the LMF window must be
maximized after it is displayed.
Memory requirements:
S
– Minimum required RAM: 96 MB
– Recommended RAM:
–– 128 MB for Windows 98 SE
–– 256 MB for Windows 2000
20X CD ROM drive
S
3 1/2 inch floppy drive
S
56kbps V.90 modem
S
Serial port (COM 1)
S
Parallel port (LPT 1)
S
PCMCIA Ethernet interface card (for example, 3COM Etherlink III)
S
with a 10Base–T–to–coax adapter
1X SC 4812T-MC Multicarrier BTS Optimization/ATP
68P64115A21–B
Sept 2003