B4
Mark position of screws by using holes as a template.
B6
Insert mounting screws, leaving space between the screw
head and the joist. (Screws are supplied.)
B8
Tighten screws.
B5
Drill a pilot hole at the TOP of each outline.
B7
Attach the rails onto the screws.
B9
Run the power supply wire through the strain relief, leaving
3" between the end of the wire and the strain relief. Tighten
the strain relief around the wire.
8
43045-01 10/15/2009
1/16" bit
3"