Start-Up Checklist - Carrier 50PEC09-18 Installation, Start-Up And Service Instructions Manual

Water source heat pump console unit with puron refrigerant (r-410a) 50 hz
Table of Contents

Advertisement

CUSTOMER:___________________________
MODEL NO.:___________________________
I. PRE-START-UP
DOES THE UNIT VOLTAGE CORRESPOND WITH THE SUPPLY VOLTAGE AVAILABLE? (Y/N)
HAVE THE POWER AND CONTROL WIRING CONNECTIONS BEEN MADE AND TERMINALS
TIGHT? (Y/N)
HAVE WATER CONNECTIONS BEEN MADE AND IS FLUID AVAILABLE AT HEAT EXCHANGER?
(Y/N)
HAS PUMP BEEN TURNED ON AND ARE ISOLATION VALVES OPEN? (Y/N)
HAS CONDENSATE CONNECTION BEEN MADE AND IS A TRAP INSTALLED? (Y/N)
IS AN AIR FILTER INSTALLED? (Y/N)
II. START-UP
IS FAN OPERATING WHEN COMPRESSOR OPERATES? (Y/N)
UNIT VOLTAGE — COOLING OPERATION
PHASE AB VOLTS
PHASE AB AMPS
CONTROL VOLTAGE
IS CONTROL VOLTAGE ABOVE 21.6 VOLTS? (Y/N)
IF NOT, CHECK FOR PROPER TRANSFORMER CONNECTION.
TEMPERATURES
FILL IN THE ANALYSIS CHART ATTACHED.
COAXIAL HEAT
COOLING CYCLE:
EXCHANGER
WATER IN
HEATING CYCLE:
WATER IN
AIR COIL
COOLING CYCLE:
AIR IN
HEATING CYCLE:
AIR IN
50PEC UNIT

START-UP CHECKLIST

JOB NAME: _______________________________________
SERIAL NO.:____________________
.
C WATER OUT
C WATER OUT
C AIR OUT
C AIR OUT
CL-1
DATE:_________
C
kPa
C
kPa
C
C
L/m
L/m