Deck Leveling Adjustment; Deck Lift Spring - Ferris IS4500ZBL3561 Operator's Manual

Is4500z series zero turn riding mower
Table of Contents

Advertisement

Troubleshooting, Adjustment & Service

DECK LEVELING ADJUSTMENT

NOTE: Before adjusting the deck level, the deck lift rod
timing must be checked and/or adjusted.
1. Park machine on a flat, level surface. Disengage the
PTO, stop the engine and engage the parking brake.
Rear tires must be inflated to 18 psi (1,24 bar); front
tires to 25 psi (1,72 bar).
2. Install the cutting height adjustment pin in the
4" (10,2 cm) position. See Figure 40.
3. Place 2 x 4 blocks under each corner of the mower
deck with the 3-1/2" sides being vertical. Place a
1/4" (0,64 cm) thick spacer on top of the rear 2 x 4
blocks. See Figure 41.
4. Adjust the front eyebolts until the chains are tight and
the deck is still resting on the 2 x 4's. Tighten jam
nuts. See Figure 42.
5. Loosen the nuts and allow the rear of the deck to
rest on the 2 x 4's and 1/4" spacers. Slide the chains
in the slots until the chains are tight and tighten the
nuts. See Figure 42.
6. Remove all 2 x 4 blocks and spacers from under the
mower deck.

DECK LIFT SPRING

The deck lift springs (A, Figure 43) are factory set to
provide optimal lifting performance.
Although it is fastened with an adjustable anchor, this is
NOT AN ADJUSTMENT POINT.
DO NOT attempt to adjust the spring length or lifting
performance will be compromised.
Figure 40. Deck Height Pin Position
Figure 41. 2 x 4 Locations
Figure 42. Deck Level Adjustment
A
Figure 43. Deck Lift Spring Location
A.
Deck Lift Spring
32
4"
(10,2 cm)
Adjust
Here
Adjust
Here

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Is4500zc28d61Is4500zc28d61ce

Table of Contents