Assembly; Blower Application - Echo SHRED'N'VAC ES-255 Operator's Manual

Echo blower operator's manual
Hide thumbs Also See for SHRED'N'VAC ES-255:
Table of Contents

Advertisement

a
ssembly
wARNiNg
Never perform maintenance or assembly procedures with engine
running or serious personal injury may result.

blower applICaTIon

Install Blower Pipes
1. Stand unit upright on blower base.
2. Release locking ring (C) with a coin or screwdriver, and rotate so
that lock symbol (A) is at top of ring.
3. Align locking ribs (E) on upper blower pipe with recesses (D) in
locking ring, and slide upper blower pipe into locking ring.
4. After inserting upper blower pipe into fan case so that line (F)
meets locking ring (C), rotate locking ring clockwise 1/8 turn to
lock upper blower pipe in place.
5. Align tabs (H) with grooves (G) and slide lower blower pipe over
upper pipe until there is light resistance. Do not force connection.
6. Hold upper pipe, and turn lower pipe clockwise, engaging posi-
tive locking channels until connection is firm. Do not force con-
nection.
NOTE
Blower use will eventually loosen pipe connections. Exclusive
positive locking system allows pipes to be tightened. If loosening
occurs, remove lower straight pipe, and install according to instruc-
tions 5 & 6.
S
'N'V
hred
O
'
M
peratOr
S
blower pipe (upper)
blower pipe (upper)
blower pipe (lower)
9
®
ac
aNual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pb-251

Table of Contents