Mounting procedure for 19" panel rack mounting

1a
IEC17000120 V1 EN-US
Figure 3:
PosNo
1a, 1b
2
3
5.3.2

Wall mounting

5.3.2.1

Overview

All case sizes, 1/2 x 19" and 1/1 x 19", can be wall mounted. It is also possible to mount the IED on a
panel or in a cubicle.
Switchgear control unit SAM600-IO
Installation manual
2
19" panel rack mounting details
The required torque for the screws is 3.5 Nm.
Description
Mounting angles, can be mounted either
to the left or the right side of the case
Screw
Washer
© 2017 - 2021 Hitachi Power Grids. All rights reserved
3
1a
IEC17000120-1-en.vsdx
Quantity
Type
2
-
8
M4x6
8
M4x6
Section 5
Mounting
M11948-2 v7