Equipment Installation; Equipment Unpacking And Inspection; Equipment Mounting; Radio Grounding Guidelines - Siemens A53685 Installation & Operation Manual

Airlink mars software defined radio (sdr)
Table of Contents

Advertisement

INSTALLATION
_________________________________________________________________________________________________________
3.5

Equipment Installation

3.5.1 Equipment Unpacking and Inspection

Inspect the equipment as soon as possible after delivery. If any part of the equipment has been
damaged in transit, immediately report the extent of the damage to Siemens Customer Service.

3.5.2 Equipment Mounting

Mounting brackets are provided for attaching the Mars radio in a 19" rack mount enclosure.

Figure 3-1 Physical Dimensions

3.5.3 Radio Grounding Guidelines

The Mars Radio is equipped with a single ground lug located on the rear of the radio. The
ground post must be connected to earth ground. Install at least a 12 AWG protective ground
wire with #10 size ring-lug to a safe grounding position.

3.5.4 Mechanical Installation

3.5.4.1

Mounting Procedure

Mounting brackets are provided for attaching the radio into a 19" rack mount cabinet. Note that
the Mars has an active fan cooling system and as such, the fans require a minimum 2"
clearance on the front and back.
RF antenna and GPS antenna are not included with the radio. Antennas should be installed by
qualified personnel and care should be taken with its grounding and connection to coaxial cable.
3-3
COM-00-21-05
OCTOBER 2021
Version No.: A

Advertisement

Table of Contents
loading

Table of Contents