Equipment Installation; Equipment Unpacking And Inspection; Equipment Mounting; Radio Grounding Guidelines - Siemens AIRLINK VENUS Installation & Operation Manual

Software defined radio
Table of Contents

Advertisement

INSTALLATION
_________________________________________________________________________________________________________
3.2

Equipment Installation

3.2.1 Equipment Unpacking and Inspection

Inspect the equipment as soon as possible after delivery. If any part of the equipment has been
damaged in transit, immediately report the extent of the damage to Siemens Customer Service.

3.2.2 Equipment Mounting

Mounting brackets are provided for attaching the Airlink Venus enclosure to a vertical or
horizontal flat surface. Figure 3-1 depicts an example of a wall-mounted unit.

Figure 3-1 Wall Mount Example

3.2.3 Radio Grounding Guidelines

The Airlink Venus Radio is equipped with a single ground lug located on the front of the radio.
The ground post must be connected to earth ground. Install at least a 12 AWG protective ground
wire with #10 size ring terminal to a safe grounding position.
3-3
COM-00-21-04
OCTOBER 2021
Version No.: A.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

A53689

Table of Contents