F Inspection And Maintenance Interval; G Technical Data - Vaillant armoMAG 4/1 G Series Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

Appendix
F
Inspection and maintenance interval
The table below lists the manufacturer requirements with respect to minimum inspection and maintenance intervals. If na-
tional regulations and directives require shorter inspection and maintenance intervals, you should observe these instead of
the intervals listed. Each time inspection and maintenance work is carried out, carry out the required preparatory and com-
pletion work.
#
Maintenance work
1
Remove any dirt from the product
2
Check the flue gas sensor for dirt and damage. Checking that the flue
gas sensor is working correctly by completely blocking the flue gas with
flue gas restrictors
3
Cleaning the burner
4
Cleaning the heat exchanger
5
Cleaning the injector rail
6
Cleaning the down-draught diverter
7
Check the ignition electrode and thermocouple for damage, and replace
any bent and damaged components
8
Checking the seals on the test nipples for damage and replacing any
damaged seals
9
Checking that the water flow switch (micro switch) is working correctly
10
Carry out a test operation on the product, incl. domestic hot water gener-
ation
11
Checking leak-tightness
12
Checking the heat input
13
Check the flame pattern. Flames must not touch the heat exchanger shaft
14
Visually inspecting the test nipples and hoses
15
Interrupt the thermocurrent by disconnecting the connection between the
thermocouple and holding magnet. The product must be shut down
16
Checking the water valve
17
Logging flue-gas measured values and any maintenance work that was
carried out
18
Checking the product to see if flue gas is escaping at the down-draught
diverter, with the doors and windows closed and the casing installed
G
Technical data
Technical data – General
Designated country (designation in
accordance with ISO 3166)
Approved gas boiler category
Unit dimensions, height
Unit dimensions, width
Unit dimensions, depth (incl. rotary
switch)
Flue pipe connection diameter
Min. length of the flue pipe
Gas connection diameter
Water connection diameter (inlet)
Water connection diameter (outlet)
26
MAG 114/1 G(E-
MAG 114/1 G(H-
BE/FR)
DACH)
BE, FR
AT, CH, DE
I
, I
(BE), II
II
2E+
3P
2E+3P
2ELL 3P
(FR)
(AT, CH)
680 mm
680 mm
350 mm
350 mm
270 mm
270 mm
110 mm
110 mm
0.5 m
0.5 m
1/2" conical
1/2" conical
G1/2"
G1/2"
G1/2"
G1/2"
Installation and maintenance instructions atmoMAG 0020271929_00
Interval
Annually
Annually
If required, at least every
2 years
If required, at least every
2 years
If required, at least every
2 years
If required, at least every
2 years
Annually
Annually
Annually
Annually
Annually
Annually
If required, at least every
2 years
Annually
Annually
If required, at least every
2 years
Annually
Annually
MAG 114/1 G(LL-
DE)
EN
(DE), II
II
2H3P
2ELL 3P
680 mm
350 mm
270 mm
110 mm
0.5 m
1/2" conical
G1/2"
G1/2"
17
18
17
17
15
19
18
MAG 114/1 G(P-
BE/FR)
BE, FR
I
, I
(BE), II
2E+
3P
2E+3P
(FR)
680 mm
350 mm
270 mm
110 mm
0.5 m
1/2" conical
G1/2"
G1/2"