8.15
Completing inspection and maintenance
work
▶
Install all of the components in reverse order.
▶
Install the product casing (→ Page 11).
▶
Start up the product.
▶
Check that all control, regulation and monitoring devices
and, in particular, the flue gas sensor (→ Page 13) are
working properly.
▶
Check that the product and the flue system are leak-tight.
▶
Log all maintenance work that is carried out.
8.16
Checking the product for leak-tightness
▶
Check that the product is leak-tight. (→ Page 15)
9
Decommissioning
▶
Press the main switch.
▶
Close the gas isolator cock.
▶
Close the cold water stop valve.
▶
Drain the product. (→ Page 16)
10 Recycling and disposal
Disposing of the packaging
▶
Dispose of the packaging correctly.
▶
Observe all relevant regulations.
11 Customer service
Applicability: Austria
Vaillant Group Austria GmbH
Clemens-Holzmeister-Straße 6
1100 Wien
Österreich
E-Mail Kundendienst: termin@vaillant.at
Internet Kundendienst: http://www.vaillant.at/werkskundendi-
enst/
Telefon: 05 7050‑2100 (zum Regionaltarif österreichweit,
bei Anrufen aus dem Mobilfunknetz ggf. abweichende Tarife
- nähere Information erhalten Sie bei Ihrem Mobilnetzbe-
treiber)
Der flächendeckende Kundendienst für ganz Österreich ist
täglich von 0 bis 24 Uhr erreichbar. Vaillant Kundendienst-
techniker sind 365 Tage für Sie unterwegs, sonn- und feier-
tags, österreichweit.
Applicability: Belgium
N.V. Vaillant S.A.
Golden Hopestraat 15
B-1620 Drogenbos
Belgien, Belgique, België
Kundendienst / Service après-vente / Klantendienst:
2 3349352
0020271929_00 atmoMAG Installation and maintenance instructions
Decommissioning 9
Applicability: Switzerland
Vaillant GmbH (Schweiz, Suisse, Svizzera)
Riedstrasse 12
CH-8953 Dietikon
Schweiz, Svizzera, Suisse
Kundendienst: 044 74429‑29
Techn. Vertriebssupport: 044 74429‑19
Applicability: Germany
Auftragsannahme Vaillant Kundendienst: 021 91 5767901
21