Tools Required:
Step 1: Wire cutters, Phillips screw driver, 9/64" hex
driver, 6 nylon zip ties and a grounding wrist strap.
Step 3: Turn off, unplug the power cord and the com-
munication cable. Remove the right cover.
Step 5: Remove the rear cover (18) screws. Place to
the side.
Step 7: Unclip the Y belt from the carriage. Remove
the carriage from the traverse by pressing down on
the threaded screw (arrow), then pull forward.
Install Ribbon Cable 3C FJE
Kit for # 109519, Procedure P/N 110623 Rev 0
1
Step 2: The ribbon cable. Should come with the 6
nylon cable zip ties to attach to the carriage.
Step 4: After removing the left cover, using the hex
driver, loosen the belt by turning the screw (arrow) 2
turns counter clockwise.
Step 6: Remove the carriage cover (4) screws.
Step 8: You need to start to remove the old ribbon
cable. With the wire cutters, snip all the white cable
ties. There should 5. Cut and remove them.
14140 NE 200th St.
Woodinville, WA 98072
1.425.398.8282
www.ioline.com