GE Zoneline AZ75E09DAC Owner's Manual And Installation Instructions page 18

Vertical air conditioners, cool only, heat/cool and heat pump models
Hide thumbs Also See for Zoneline AZ75E09DAC:
Table of Contents

Advertisement

Available languages

Available languages

WALL PLENUM AND ARCHITECTURAL LOUVER INSTALLATION
• Install the appropriate wall plenum through the exterior wall in accordance with the Installation Instructions
provided with the plenum.
IMPORTANT:
Proper wall header construction is required. The plenum requires proper flashing,
shim and caulk for a weather resistant installation.
Architectural Louver—
RAVAL1
Exterior/Outside Wall
BUILD AND INSTALL THE ZONELINE
1
BASE PLATFORM
" min. x 23
1. Construct a 23
1
4
with legs to raise the platform a minimum of 8".
NOTE: The platform must have a load-bearing
capacity of 175 lbs. minimum.
Left side of platform
" min.
23
1
4
8" min.
for drain
access
NOTE: Specific cutout size
for drain connections needs
to be determined by the installer
for the given installation situation.
Installation Instructions
The wall plenum is not designed to carry structural loads.
RAVWP6 – 6"D x 19
RAVWP8 – 8"D x 19
RAVWP12 – 12"D x 19
RAVWP15 – 15"D x 19
" min. square platform
1
4
Back of platform
" min.
23
1
4
Cutout for drain
"
connection(s)
5
1
4
(see NOTE below)
"
6
1
2
"
5
1
4
"
8
1
2
Proper header for structural
support.
Apply proper caulking
and flashing.
Wall Plenum
"W x 32"H
3
4
"W x 32"H
3
4
"W x 32"H
3
4
"W x 32"H
3
4
2. Make drain hole cutout(s):
• Primary Drain – Centerline of drain is
• Secondary Drain – Centerline of drain
3. Place the platform in the utility closet
with the following clearance between it
and the interior surface of the walls/door/panel:
• 4" min. from front of the case –
• 5" min. from front of the case –
• 3" min. from two sides of the case
4. Align the platform with the opening of
the wall plenum and secure to the floor
using appropriate brackets and bolts.
18
Properly square
and level plenum.
" from left platform edge
approximately 5
1
4
" from back platform edge.
and 8
1
2
" from left platform edge
is approximately 6
1
2
" from back platform edge.
and 5
1
4
Unit to be installed through FRONT of case
Unit to be installed through SIDE of case
Case

Advertisement

Table of Contents
loading

Table of Contents