Spreaders must be used to provide the
vertical lift on single controllers to prevent
eyebolt failure. Always keep the controller
upright while lifting.
Some enclosure sections may contain
heavy or special equipment that cause the
center of gravity to be off center.
A 4 ton to 7 ton rated fork lift is required
depending on weight as listed in Table 1
on page 8.

Figure 7 - Lifting and assembly

Adjust rigging lengths to maintain the enclosure in a
upright position. The angle between the lifting cables
and vertical must not exceed 45°. Ropes or cables must
not pass through the holes in lifting angles or eyebolts.
Use slings with safety hooks or shackles of adequate
load rating.
JOHNSON CONTROLS
After the enclosure sections are in place, bolt together
with 1/2 in. hardware supplied, then install and wire
the fan assemblies. Connect the DC bus cables to the
modules and plug in the control connector. Assemble
the ground bus splice(s).

Mounting requirements

• Only qualified personnel must install this
equipment.
• Install the unit in a secure upright position in a
well ventilated area.
• A noncombustible insulating floor or mat must be
provided in the area immediately surrounding the
electrical system at the place where maintenance
operations are to be performed.
• As a minimum, the installation of the equipment
must conform to the NEC Article 110 require-
ments for electrical installations, OSHA, and any
other applicable national, regional, or industry
codes and standards.
• Installation practices must conform to the latest
revision of NFPA 70E Electrical Safety Require-
ments for Employee Workplaces.

Mounting

Each shipping section must be leveled and firmly se-
cured to a supporting foundation. Steel shims may be
used for final leveling, if necessary. When three or
more shipping sections are to be arranged in one con-
tinuous lineup, the center shipping section must nor-
mally be the first located.
Follow the equipment outline drawings provided with
the unit to determine the location of the mounting bolt
holes and any conduit locations.
Various methods may be used to anchor the enclo-
sure to the foundation, including expandable inserts or
LD12154a
J bolts embedded in concrete. The recommended size
for anchor bolts is 1/2 in. (13 mm).