Assembly; Preparation Of Actuator For Assembly - Master FORCE 300 N Instruction Manual

Table of Contents

Advertisement

14. Assembly

These indications are intended for the attention of technicians and specialized
personnel. Basic job and safety techniques are therefore not included.
All preparatory operations, assembly and electrical connections must be carried out by
technical and specialized personnel to guarantee best performances and good function of
the CLOUD RADIO chain operated actuator.
First of all, please check that the following fundamental points have been satisfied:
Actuator specifications must be sufficient for movement of the window without
encountering any obstacle. The limits indicated in the technical data table must
not be superseded (page 7) and the most appropriate stroke should be selected.
Calculations should be checked using the formula indicated on page 6.
Ensure that the actuator has not been damaged during transport, first visually
and then by powering in both directions.
Check that the width of the inside of the window (where the actuator is to be
assembled) is over 405 mm, otherwise the actuator should not be installed.
Check that once the actuator has been installed the
distance between the fixed part of the window frame
(where the actuator is to be assembled) and the
mobile part of the window frame (where the bracket is
to be fixed) is greater than or equal to 0 mm (Fig. 1). If
this is not the case the actuator will not function
correctly as the window will not close correctly. If
required, add additional thickness below the support
brackets to reset the quota.

14.1. Preparation of actuator for assembly

Before starting assembly of the actuator, prepare the following material for completion,
equipment and tools.
For fixing onto metal window frames: M5 threaded inserts (6 pieces), M5x12 flat
headed metric screws (6 pieces).
For fixing onto wooden window frames: self-threading screws for wood Ø4.5 (6
pieces).
For fixing onto PVC window frames: self-threading screws for metal Ø4.8 (6 pieces).
Equipment and tools: measuring tape, pencil, drill/screwdriver, set of drill heads for
metal, insert for screwing in, electricians pliers, screwdrivers.
Figure 1
Page 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

1120.8

Table of Contents