INSTALLATION

ELECTRICAL INSTALLATION

Connect the machine by plugging it into an earthed wall
socket. The electrical wall socket must be placed outside
of the installation area to be easily accessible.

CONNECTION ON DELIVERY

• 400 V, 3-phase, 16 A
• 50 Hz
• Heat output 5000W
• Use a type A residual-current device.
NOTE!
Do not connect the machine to the mains electricity
supply by an extension lead.

SWITCH-OVER

The switchover must be performed by a qualifi ed
electrician.
See the Settings chapter.
18

COIN OPERATION

The machine is prepared for coin operation. Such
installation must be carried out by a qualifi ed professional.
The installation requires a connection cable to power the
coin meter. This connection cable can be ordered using
the factory art. no. 92 090 95.
The coin meter shall be able to short circuit two signal
lines for periods of up to 10 minutes. This is to give the
user time to load the machine, choose a programme and
start the programme after putting the coins in.
"Insert coin" appears on the display when the machine is
started with the main power switch.