6
Set the left handrail assembly (C) on the floor in
the position shown.
Attach the Push Bar Bottom (109) to the left
handrail assembly (C) with two 5/16" x 3/4"
Patch Screws (108); do not fully tighten the
Patch Screws yet.
Attach the Push Bar Bottom (109) to the right
handrail assembly (D) in the same way.
7. Set the handrail assembly (E) on the floor in the
position shown. Attach the Push Bar Top (110)
with six #8 x 5/8" Machine Screws (106); start
all six Machine Screws, and then tighten
them. Do not overtighten the Machine Screws.
6
108
108
7
106
106
110
12
D
109
C
106
E