Download Print this page

Panasonic PV-V4600 Service Manual page 21

Hide thumbs Also See for PV-V4600:

Advertisement

5.1.2.1. Notes in chart
1. Installation of Top Cover
Install the Top Cover front portion at a downward angle so that the
tab on the Front Panel Ass'y fits into the hole in the Top Cover.
Then, lower the rear portion into place and tighten 2 Screws (S-1)
and 2 Screws (S-2).
2. Installation of Front Panel Ass'y
CAUTION:
Opener Lever may be damaged when Front Panel Ass'y is
installed, with Cassette Door-Lid of Front Panel Ass'y and Opener
21

Advertisement

loading