Installing Your Switch - Extreme Networks ExtremeSwitching SLX 9250 Hardware Installation Manual

Table of Contents

Advertisement

Installing Your Switch

Installing Your Switch
Safety Considerations for Installing Switches
What You Will Need for the Installation
Attaching the Switch to a Rack
Installing Optional Components
Installing Internal Power Supplies
Powering up the Switch
Connecting Network Interface Cables
Installing Your Switch
Before you attempt to install or remove an Extreme Networks switch, read the precautions in
Considerations for Installing Switches
Extreme Networks switches fit into standard 19-inch equipment racks.
A four-post rack-mounting kit is provided with the switch. A two-post kit can be ordered separately.
The installation process includes the following tasks:
1. Prepare to install the switch.
See
What You Will Need for the Installation
2. Install the switch in the rack.
See
Attaching the Switch to a Rack
3. Install optional components: optical transceivers and cables.
See the instructions in
4. If your switch does not come with an installed internal power supply, install one or two power
supplies.
See
Installing Internal Power Supplies
5. Power up the switch.
See
Powering up the Switch
36
ExtremeSwitching SLX 9250 Hardware Installation Guide
on page 36
on page 57
on page 37.
on page 38.
Installing Optional Components
Note
Be aware of whether the power supply you are installing is AC-powered or a DC-powered.
The installation instructions are different depending upon what type of power is used.
on page 57.
on page 37
on page 37
on page 38
on page 48
on page 50
on page 57
on page 37.
on page 48.
on page 50.
Safety

Advertisement

Table of Contents
loading

Table of Contents