Carrier WeatherExpert 48LC Series Installation Instructions Manual page 36

Single package rooftop gas heat/electric cooling unit with puron (r-410a) refrigerant
Table of Contents

Advertisement

Table 10 — Economizer Module
(Left Hand Terminal Blocks)
LABEL
TYPE
Top Left Terminal Block
MAT
20k NTC
Mixed Air Temperature Sensor (Polarity
MAT
and COM
Insensitive Connection)
OAT
20k NTC
Outdoor Air Temperature Sensor (Polarity
OAT
and COM
Insensitive Connection)
S-BUS
S-BUS (Sylk
Enthalpy Control Sensor
S-BUS
Bus)
(Polarity Insensitive Connection)
Bottom Left Terminal Block
Air Quality Sensor Input (e.g. CO
IAQ 2-10
2-10 vdc
sensor)
IAQ COM
COM
Air Quality Sensor Common
IAQ 24V
24 vac
Air Quality Sensor 24 vac Source
ACT 2-10
2-10 vdc
Damper Actuator Output (2-10 vdc)
ACT COM
COM
Damper Actuator Output Common
ACT 24v
24 vac
Damper Actuator 24 vac Source
*Sylk is a trademark of Honeywell International Inc.
Table 11 — Economizer Module
(Right Hand Terminal Blocks)
LABEL
TYPE
Top Right Terminal Blocks
AUX2 I
24 vac IN
The first terminal is not used.
Shut Down (SD) or HEAT (W)
Conventional only
OCC
24 vac IN
and
Heat Pump Changeover (O-B) in Heat
Pump mode.
E-GND
E-GND
Occupied/Unoccupied Input
EXH1
24 vac OUT Exhaust Fan 1 Output
Programmable:
Exhaust fan 2 output
or
AUX1 O
24 vac OUT
ERV
or
System alarm output
Bottom Right Terminal Blocks
Y2 in - Cooling Stage 2 Input from space
Y2-I
24 vac IN
thermostat
24 vac OUT Y2 out - Cooling Stage 2 Output
Y2-O
2 mechanical cooling
Y1 in - Cooling Stage 2 Input from space
Y1-I
24 vac IN
thermostat
24 vac OUT Y1 out - Cooling Stage 2 Output to stage
Y1-O
2 mechanical cooling
C
COM
24 vac Common
R
24 vac
24 vac Power (hot)
S-Bus Sensor Wiring
The labels on the sensors and controller are color coded for ease of
installation. Orange labeled sensors can only be wired to orange
terminals on the controller. Brown labeled sensors can only be
wired to S-bus (brown) terminals. Use Fig. 60 and Table 12 to lo-
cate the wiring terminals for each S-Bus and enthalpy control
sensor.
DESCRIPTION
2
DESCRIPTION
to stage
S-BUS
TERMINALS
(1 AND 2)
Fig. 60 — S-Bus Sensor DIP Switches
Table 12 — HH57AC081 Sensor Wiring Terminations
TERMINAL
NUMBER
LABEL
1
S-BUS
2
S-BUS
Use Fig. 60 and Table 13 to set the DIP switches for the desired
use of the sensor.
Table 13 — HH57AC081 Sensor DIP Switch
DIP SWITCH POSITIONS FOR SWITCHES 1, 2, AND 3
USE
1
DA
OFF
RA
ON
OA
OFF
NOTE: When an S-Bus sensor is connected to an existing net-
work, it will take 60 minutes for the network to recognize and
auto-configure itself to use the new sensor.
During the 60-minute setup period, no alarms for sensor failures
(except SAT) will be issued and no economizing function will be
available.
CO
Sensor Wiring
2
When using a CO
sensor, the black and brown common wires are
2
internally connected and only one is connected to "IAQ COM" on
the W7220. Use the power from the W7220 to power the CO
sensor OR make sure the ground for the power supplies are com-
mon. See Fig. 61 for CO
36
DIP
SWITCH
LABEL
DIP
SWITCHES
(3)
S-BUS
2 PIN SIDE
CONNECTOR
TYPE
DESCRIPTION
S-BUS
Communications
S-BUS
(Enthalpy Control
Sensor Bus)
S-BUS
Communications
S-BUS
(Enthalpy Control
Sensor Bus)
2
ON
OFF
OFF
sensor wiring.
2
3
OFF
OFF
OFF
2

Advertisement

Table of Contents
loading

Table of Contents