Download Print this page

Installation Checklist - Vaillant 0020185684 System Installation Instructions

System, geotherm 3kw mono, gas-fired boiler, vrc 700

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 3

2 Installation checklist

1.2
Wiring diagram 0020185684
1
Heat generator
2
Heat pump
3e
Circulation pump
12
System control
2
Installation checklist
You must observe all the operating and installation instructions included with the system components.
Work
1
Comply with the conditions for the installation environment
2
Install the heat pump on a wall that has sufficient load-bearing capa-
city
3
Comply with the specified minimum clearances
4
Observe the position of the VRC 700
5
Check the brine circuit for leak-tightness
6
Insulate the brine pipes in the house so that they are vapour-diffu-
sion-tight
7
Use cold pipe clips to install the brine pipes in the house
2
12g
eBUS bus coupler
12k
Limit thermostat
12m
Outdoor temperature sensor
DHW
Cylinder temperature sensor
Comments/settings
1.
Minimum volume of the installation room 1.60 m³
Environmental temperature 7 °C – 40 °C
2.
3.
Frost-proof
4.
Dry
Weight of the heat pump: 59 kg
For free spaces for maintenance work, see the installa-
tion instructions for the relevant system components
in the living room or main control room
Prevent condensation.
Prevent thermal bridges.
System installation instructions 0020251825_01

Advertisement

loading