Set-Up; Removing The Packaging; Checking The Scope Of Delivery; Selecting The Installation Site - Vaillant geoTHERM Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

4

Set-up

4.1

Removing the packaging

Carefully remove the packaging and padding without
damaging the parts of the product.
Note
Remove the transport locks from the product
only after it has been mounted on the wall or
on the mounting frame.
4.2

Checking the scope of delivery

Check that the scope of delivery is complete.
Quantity
Designation
1
Unit mounting bracket
1
Bag of small parts with fixing material
1
Heat insulation for the brine line
1
Heat pump
1
Installation set:
4 x compression fitting
2 x connection pipe (22 mm Cu)
2 x seal with metal support ring for brine
circuit,
2 x flat seal for heating circuit
1
Enclosed documentation
4.3

Selecting the installation site

Select a dry room that is frost-proof throughout and
where the environmental temperature does not fall below
7 °C and does not exceed a maximum of 40 °C.
The installation room must have a minimum volume of
1.60 m³ at a refrigerant volume of 0.70 kg (R410A).
Ensure that the required minimum clearances can be
maintained.
Choose the installation site so that, where possible, vi-
brations that occur during operation are not transferred.
Ensure that the fastening is adapted to the circumstances
so that it can bear the weight of the heat pump.
Weight without packaging: 59 kg
In the case of walls with a mass per unit area of less than
2
200 kg/m
, lightweight construction walls and, in particu-
lar, dry-lined walls, use a mounting frame for the prewall
installation of the heat pump in order to prevent vibrations
and resulting noise emissions.
Secure the mounting frame to the wall only at floor and
ceiling level in order to minimise vibrations.
Ensure that cables can be easily routed (for brine, do-
mestic hot water and heating).
Use an open hopper for the drain hose on the expansion
relief valve in the heating circuit.
Ensure that there is an option to divert any condensate
that forms.
0020250180_00 geoTHERM Installation and maintenance instructions
4.4

Transporting the heat pump

Warning.
Risk of injury from lifting a heavy weight.
The heat pump weighs 59 kg.
To prevent injuries, have several people
lift the heat pump.
Caution.
Risk of damage due to improper trans-
portation.
Regardless of the mode of transport, the heat
pump must never be tilted by more than 45°.
Otherwise, this may lead to faults in the refri-
gerant circuit during subsequent operation.
In the worst case scenario, this may lead to a
fault in the whole system.
During transport, do not tilt the heat pump
by any more than the maximum angle of
45°.
1.
Have two people lift the product on the frame.
2.
Transport the product to the installation site.
3.
Always transport the product as illustrated above.
4.
Never transport the product as illustrated above.
Set-up 4
11

Advertisement

Table of Contents
loading

Table of Contents