Download Print this page

Kohler VOLUTE K-20610T Installation Instructions page 4

Freestanding bath

Advertisement

3. Wood base installation and drainage pipe insertion: 4
people should stand still and raise the cast iron while
another person places the wood base directly
beneath the bathtub. Insert the drainage pipe pulled
from the drainage into the drainage hole of the
bathroom and quickly seal it with silicone. The other
4 people should slowly put down the bathtub and
prevent the bathtub from falling and damaging the
wood base. Fit the bathtub on the wood base.
4. Overflow plate installation: The 4 people should
stand still and lift the bathtub slightly to place the
positioning pin of the U-shape overflow plate into the
positioning hole on the bottom of the bathtub. Lower
the bathtub gently and just an M6 screw to fasten the
overflow plate to the bathtub.
5. Handrail installation(only for bath with handrail):
Open the bathtub handrail installation screws pack
1329702. Insert the 1329706 rivet into the handrail
hole. Place the 1329705 spring washer on the
1329703 hexagon socket screw. Use the 1329707
hexagon socket wrench to fasten the countersunk
head screw onto handrail 1148886. (Make sure the
screw tightens the 1329705 spring washer to prevent
handrail from becoming loose). Finally, insert the
plastic lid 1329704 into the handrail.
(Attention: Please make sure the screw is tightened
and the handrail is not loose. If maintenance is
required after the plastic lid is inserted, please use a
spare plastic lid.
1315528-T01-B
1315528-T01-C
Screw Hole on Bathtub
See Detail A
A
-4-
3.
4
4.
:4
M6
Lock Bracket on Bathtub with Screw
Insert Pin Into Hole
5.
1329702
1329705
1329707
1148886
1148886
Handail
1329705
Spring Washers
Detail
4
1329706
1329703
1329705
1329704
1329706 Riveting
1329704 Plastic Cover
1329703
Hexagon Socxet Screws
A
U

Advertisement

loading

This manual is also suitable for:

Volute k-20610t-grVolute k-20379tVolute k-20379t-grVolute k-23746tVolute k-23746t-grVolute k-23747t ... Show all