Tools And Materials Required - Kohler VIA K-20629T-BW Installation Instructions Manual

Vitreous china wall-hung p-trap toilet
Table of Contents

Advertisement

NOTES
·
Observe all local plumbing and building codes.
·
Shut off the water supply.
·
Seat post holes are on 140mm centers.
·
Passageways is longer than 50mm.
·
Ensure have the correct roughing-in dimensions.
Fig.#1
.
·
Be very careful while working with vitreous china products.
Vitreous china can break or chip if the bolts or nuts are
overtightened, or if carelessly handled.
·
Carefully inspect the new bowl for any sign of damage.
·
Fixture dimensions are nominal and conform to tolerances
established by ASME Standards (A112.19.2-2013).
·
This product complies with GB 25502-2017. Water
Efficiency Grade 1.

TOOLS AND MATERIALS REQUIRED

(Not supplied)
·
254mm adjustable wrench
·
Metal file (file cut)
·
Tape measure
·
Tubing cutter
·
Level
·
Hacksaw
·
Putty knife
·
Screwdriver
·
Straight pipe coupling
·
Connection packing
ROUGHING-IN
Reference Value
353
322
1132463-T01-D
218
Kohler reserves the right to change marked dimensions without prior notice.
·
·
·
·
·
See
·
·
·
2013)
·
·
254mm
·
·
·
·
·
·
·
·
·
292
360
375
400
360
Fig.#1
1
-2-
140mm
50mm
1
ASME
GB 25502-2017
90
590
475
140
(A112.19.2-
1
Unit: mm
:
55
102
295

Advertisement

Table of Contents
loading

Table of Contents