Installation - Kohler REVE K-24766T-S Installation Instructions Manual

Wall-hung
Hide thumbs Also See for REVE K-24766T-S:
Table of Contents

Advertisement

INSTALLATION

1. INSTALL THE TANK
1) Turn the water supply off before installing the new toilet.
2) Install the concealed tank system in wall before decorating
the wall.
3) Install the tank system per tank's installation instructions.
Note:
Refer to installation instructions of in-wall tank for SKU
of faceplate.
2. SET THE SPACING OF THE BOWL
After you install the tank, be careful to set the spacing of set
aside the length for carrier studs and tighten nut. The bowl on
wall according to the dimensions as shown. See Fig. #3.
1268139-T01-B
NOTE: Please reserve 10mm space for
230
315
350
215
1.
1)
2)
3)
Fig.#2
2
2.
the nut strictly according to the
picture. Otherwise, it will greatly
affect the loading capacity of the
toilet.
10mm
Fig.#3
3
-3-
3
Unit: mm
:
Carrier Stud
Nut

Advertisement

Table of Contents
loading

Table of Contents