Main Unit Power; Standard Wiring - Trane Horizon OADG Series Installation, Operation And Maintenance Manual

Outdoor air unit
Table of Contents

Advertisement

Figure 38. OAN utility connections, in. (cm)
CONDENSATE DRAIN
O 1.5000 NPT
(3.8)
ELECTRICAL
DISCONNECT
23.000
(58.4)
41.888
(106.4)
18.888
(48)
GAS INLET
O 1.5000 NPT
36.207
(92)
DETAIL A
3.000
5.250
(13.3)
(7.6)
6.500
(16.5)
5.250
(13.3)
DETAIL A
Note: All field installed wiring must conform to NEC
guidelines as well as State and Local codes.
Verify that the power supply available is compatible with
the unit's nameplate ratings. The available supply power
must be within 10 percent of the rated voltage stamped on
the nameplate. Use only copper conductors to connect the
power supply to the unit.
OAU-SVX006C-EN
5.541
(14.1)
126.528
(321.4)
7.375
(18.7)
(3.8)
THROUGH-BASE ELECTRIC

Main Unit Power

WARNING
Hazardous Voltage!
Failure to disconnect power before servicing could
result in death or serious injury. Disconnect all electric
power, including remote disconnects before servicing.
Follow proper lockout/tagout procedures to ensure the
power can not be inadvertently energized.
AVERTISSEMENT
Risque d'électrocution!
Le non-respect de cette consigne peut entraîner des
blessures graves, voire mortelles. Avant toute
intervention, coupez l'alimentation électrique, y
compris aux sectionneurs à distance. Suivez
scrupuleusement les procédures de verrouillage/mise
hors service préconisées pour empêcher tout
rétablissement accidentel de l'alimentation électrique.
NOTICE
Use Copper Conductors Only!
Failure to use copper conductors could result in
equipment damage as unit terminals are not designed
to accept other types of conductors.

Standard Wiring

WARNING
Proper Field Wiring and Grounding
Required!
Failure to follow code could result in death or serious
injury. All field wiring MUST be performed by qualified
personnel. Improperly installed and grounded field
wiring poses FIRE and ELECTROCUTION hazards. To
avoid these hazards, you MUST follow requirements for
field wiring installation and grounding as described in
NEC and your local/state electrical codes.
AVERTISSEMENT
Câblage sur site et mise à la terre corrects
nécessaires!
Le non-respect de la réglementation peut entraîner des
blessures graves, voire mortelles. Il est IMPÉRATIF de
confier l'ensemble du câblage sur site à un électricien
qualifié. Un câblage sur site mal installé ou mal mis à la
terre constitue des risques D'INCENDIE et
D'ÉLECTROCUTION. Pour éviter ces risques, il est
IMPÉRATIF de respecter les obligations en matière de
pose de câblage sur site et de mise à la terre tel que
stipulé dans les règles du NEC et dans les
réglementations électriques locales/nationales.
Installation
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Horizon oang series

Table of Contents