Dimensions And Connections/Clearances - Potterton Assure System Series Installation And Service Manual

High efficiency wall hung condensing gas boiler
Table of Contents

Advertisement

3 Technical specifications
3.3

Dimensions and connections/clearances

Fig.3
Dimensions and connections / clearances
5
450
Fig.4
Flue position
>1.5°
16
The clearances shown in the diagram are minimum requirements
to allow for case removal, spanner access and air movement.
390
These should be observed at all times and kept clear of obstructions.
5
178
700
200
285
5
1
2
3
4
5
6
7
9
10
Ø116 min
106
160
1
2
10
3
Condensate trap sump
Condensate drain
Heating circuit water flow
Gas inlet
Pressure relief pipe
Heating circuit water return
Pump drain point
Cable entry points
Boiler drain point on flow isolation tap
=
=
Ø100
154
9
4
6
5
7
PN-0000624
PN-0000649

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents