3.3
Dimensions and connections/clearances
Fig.3
Dimensions and connections / clearances
5
450
7678846 - A - 22052017
390
5
178
700
200
285
5
1
2
3
4
5
6
7
8
9
10
11
The clearances shown in the diagram are minimum requirements to allow
for case removal, spanner access and air movement. These should be ob
served at all times and kept clear of obstructions.
See
The back cover for contact details.
11
1
2
3
5
4
6
Condensate trap sump
Condensate drain
Heating circuit water flow
Hot water outlet
Gas inlet
Pressure relief pipe
Cold water inlet
Heating circuit water return
Pump drain point
Boiler drain point on flow isolation pipe (Not shown)
Cable entry points
3 Technical specifications
7 8
9
PN-0000338
17