14 Appendix; Benchmark Commissioning Checklist - Potterton Assure System Series Installation And Service Manual

High efficiency wall hung condensing gas boiler
Table of Contents

Advertisement

14 Appendix

14 Appendix
14.1

Benchmark commissioning checklist

Warning
After servicing or performing any maintenance on the boiler
ensure that
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer's instructions and complete this Benchmark Commissioning Checklist will invalidate the
warranty. This does not affect the customer's statutory rights.
Customer
n
a
m
: e
Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT
N
A
M
E
Company
n
a
m
: e
Company address:
CONTROLS (tick the appropriate boxes)
Time and temperature control to heating
Time and temperature control to hot water
Heating zone valves
Hot water zone valves
Thermostatic radiator val
v
e
s
Automatic bypass to
s
s y
e t
m
Boiler interlock
ALL SYSTEMS
What system cleaner was used?
What inhibitor was used?
CENTRAL HEATING MODE measure and record:
Gas rate
Burner operating pressure (if applicabl
Central heating return temperature
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)?
DOMESTIC HOT WATER MODE Measure and Record:
Gas rate
Burner operating pressure (at maximum
Cold water inlet temperature
Hot water has been checked at all outlets
CONDENSING BOILERS ONLY
The condensate drain has been installed in accordance with the manufacturer's instructions and/or
64
: )
Room thermostat and
Cylinder thermostat and
) e
r
t a
) e
T
e
lephone number:
G
a
s
Safe register number:
T
e
lephone number:
Commissioning date:
p
o r
g
a r
m
m
r e
i t /
m
r e
Load/weather
c
o
m
p
e
n
s
t a
o i
n
p
o r
g
a r
m
m
r e
i t /
m
r e
F
t i
e t
d
F
t i
e t
d
F
t i
e t
d
F
t i
e t
d
's
n i
t s
u r
t c
o i
m³/hr
m
b
r a
OR Gas inlet
m³/hr
m
b
r a
OR Gas inlet pressure at maximum
B
S
5
5
4
6
P
o r
g
a r
m
m
a
b
le room thermostat
O
p
i t
C
n
s
Quantity
Yes
OR
r p
s e
u s
e r
Yes
Yes
OR
a r
e t
Yes
Temperature
B /
S
6
7
9
8
m
u
m
start control
o
m
b
n i
t a
o i
n
Boiler
N
t o
required
N
t o
required
N
t o
required
N
t o
required
Provided
Y
e
s
litres
No
ft³/hr
m
b
r a
°C
°C
No
No
ft³/hr
m
b
r a
°C
°C
I/min
Y
e
s

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents