Mounting System Installation - GE PNRQ20RBL Owner's Manual & Installation Instructions

Table of Contents

Advertisement

Available languages

Available languages

Reverse Osmosis Assembly

MOUNTING SYSTEM INSTALLATION

Choose a location under the sink to mount the
system. Location should be easily accessible, with
adequate clearance between the bottom of the filter
cartridges and the floor or bottom of the cabinet for
removal of filter cartridges. Allow enough space on
either side of the system for the tubing connections.
1.
Remove the prefilter and postfilter cartridges.
2.
Remove the assembly cover by unlocking the
four tabs on the cover from the system.
To remove
Prefilter
3.
Use a flat-head screwdriver to work from left to
right from the underside of the system.
4.
Use the icons on the bottom of the system for
screwdriver positioning.
Screwdriver positioning
System opening
12
Installation Instructions
To remove
Postfilter
Tab
Screwdriver
5.
Hold the Reverse Osmosis assembly up to the
wall surface where you wish to install it. Mark
location for screws. There should be a minimum
of 17" from the marks to the bottom of the
cabinet floor.
Screw locations
IMPORTANT —
inside the assembly area. Use only to mark
mounting hole locations.
clearance between the head of the screw and
wall (drill pilot holes if needed).
7"
17"
7.
Hang the Reverse Osmosis assembly on the
screws. Tighten or loosen the screws as desired
until the system is secure on the wall.
8.
To install the
cover, line up
the front tabs on
the cover with
the openings in
the system.
in place; the tabs
will flex, allowing
the cover to snap
in place.
10. Remove the
membrane
cartridge.
Membrane
Do not get dirt or debris
Screws
Wall
Screw
To remove
49-50322

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Pnrq21rbnPnrq21rrb

Table of Contents