Powering On The Switch; Checking The Installation - Extreme Networks Summit Summit1 Hardware Installation Manual

Extreme summit summit1: installation guide
Hide thumbs Also See for Summit Summit1:
Table of Contents

Advertisement

Figure 2-4 shows the pin-outs for a 9-pin to 9-pin PC-AT null-modem serial cable.
Summit
Cable connector: 9-pin female
Screen
DTR
TxD
RxD
CTS
Ground
DSR
RTS
DCD
Figure 2-4: PC-AT serial null-modem cable pin-outs
P
OWERING
To turn on power to the switch, connect the AC power cable to the switch and then to
the wall outlet. For the Summit1, Summit4, Summit24, and Summit48 switches, turn the
on/off switch to the on position.
The Summit7i switch has no on/off switch.
C
HECKING THE
After turning on power to the Summit switch, the device performs a Power On Self-Test
(POST).
During the POST, all ports are temporarily disabled, the packet LED is off, the power
LED is on, and the MGMT LED flashes. The MGMT LED flashes until the switch has
successfully passed the POST.
If the switch passes the POST, the MGMT LED blinks at a slow rate (1 blink per
second). If the switch fails the POST, the MGMT LED shows a solid yellow light.
For more information on the LEDs, refer to Chapter 1.
S
S
H
I
UMMIT
WITCH
ARDWARE
NSTALLATION
PC-AT Serial Port
Cable connector: 9-pin female
Shell
4
3
2
8
5
6
7
1
O
S
N THE
I
NSTALLATION
G
UIDE
Shell
Screen
1
DCD
2
RxD
3
TxD
4
DTR
5
Ground
6
DSR
7
RTS
8
CTS
ser_sum2
WITCH
P
O
S
OWERING
N THE
WITCH
2-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Summit24Summit4Summit48Summit4/fxSummit1/lxSummit7i

Table of Contents