GE AHL24 Owner's Manual And Installation Instructions page 10

Table of Contents

Advertisement

Available languages

Available languages

PREPARE THE CASE
4
NOTE: Attach curtains to the air conditioner
before placing the air conditioner in window.
Install the top mounting rail with four type A
A
screws.
Slide left-hand curtain assembly into left end
B
of top and bottom mounting rail. Repeat for
right-hand curtain assembly.
C
Fasten curtain retainer strips to the sides of the
outer case with three type A screws on each
side.
A
B
A. Top mounting rail
B. Type A screws
PREPARE WINDOW FOR INSTALLATION
5
A
Measure the width of the window opening.
B
Mark the center line on the inside windowsill.
A
B
A. Width of window opening
B. Center line
Installation Instructions
C
D
C. Type A screws
D. Side curtains
INSTALL OUTER CASE IN WINDOW
6
Place outer case in window. Lower sash until it
A
rests behind front flange of top mounting rail.
Bottom mounting rail must rest behind window
sill.
Top rail
SILL
Expand the curtain panels to fill the window.
B
Secure with type C wood screw in top corners.
If needed, use drill and 1/8" bit to drill pilot holes
for the screws.
Use three type C screws to secure the top
C
mounting rail to the window. Drill pilot holes if
necessary.
10
Window sash
About
Bottom rail

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ahh24

Table of Contents