Objects At Right Angles - Calculated Industries Sheet Metal/HVAC Pro Calc User Manual

Advanced construction-math calculator for sheet metal & hvac professionals
Table of Contents

Advertisement

Objects at Right Angles

When you are working with objects at Right Angles, set up the
"Measured Triangles" and subsequent calculations in the same man-
ner as the previous inline objects. Due to the vertical misalignment
of the two ducts, the added step of finding the actual length will
be required.
With the exception of the duct dimensions the measured lengths of
Triangle III are slant lengths. Therefore, if the calculations are
processed using these dimensions the results would also be slant
lengths. To find the actual lengths for "Yp" and "Xp" requires the
erection of two true length Triangles. The true length Triangles will
utilize "Ye" from the elevation offset as the "Y" leg of both triangles
and the measured lengths of "a" and "c" as the "r" legs.
U
'
G
— 65
SER
S
UIDE

Advertisement

Table of Contents
loading

This manual is also suitable for:

4090

Table of Contents