Powering On The Ap - Huawei AP7052DN Hardware Installation And Maintenance Manual

Table of Contents

Advertisement

AP7052DN&AP7152DN
Hardware Installation and Maintenance Guide
No.
6
7
8

2.10 Powering on the AP

After the AP is powered on, observe the indicator on the AP to check the system running
status. For details, see 1.2 Indicator Description.
Issue 01 (2017-12-29)
Check Item
The power cables and ground cables are separated from other cables and
bundled separately.
Connectors of signal cables are complete, intact, and tightly connected.
The signal cables are not damaged or broken.
Labels on cables are clear and correct.
Do not frequently power on and off the device.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 AP Installation
24

Advertisement

Table of Contents
loading

Table of Contents