Figure 2-1. Installing rubber feet for desktop installation

Rack Installation

The VH-2402-L3 can be mounted in an EIA standard-
sized, 19-inch rack, which can be placed in a wiring
closet with other equipment. To install, attach the
mounting brackets on the switch's side panels (one on
each side) and secure them with the screws provided.
Figure 2- 2A. Attaching the mounting brackets to the switch
Then, use the screws provided with the equipment rack
to mount the switch on the rack.
9033693-01