Carrier 40ZS Series Installation, Operation And Maintenance Instructions

Carrier 40ZS Series Installation, Operation And Maintenance Instructions

Indoor units

Advertisement

Quick Links

I N S TA L L AT I O N , O P E R AT I O N A N D
M A I N T E N A N C E
I N S T R U C T I O N S
Indoor units
40ZS/ZF
Nominal cooling capacity 20 - 135 kW
Nominal heating capacity 20 - 145 kW
Translation of the original document 80259, 12.2020

Advertisement

Table of Contents
loading

Summary of Contents for Carrier 40ZS Series

  • Page 1 I N S TA L L AT I O N , O P E R AT I O N A N D M A I N T E N A N C E I N S T R U C T I O N S Indoor units 40ZS/ZF Nominal cooling capacity 20 - 135 kW...
  • Page 2: Table Of Contents

    CONTENTS 1 - INTRODUCTION ..............................3 2 - SAFETY ADVISE ..............................3 3 - AVAILABLE ASSEMBLIES ..........................4 4 - UNIT IDENTIFICATION ............................5 5 - TRANSPORT AND HANDLING ........................... 5 5.1 Transport ..............................5 5.2 Discharging of the unit ..........................5 5.3 Coordinates of the centre of gravity ......................
  • Page 3: Introduction

    1 - INTRODUCTION Indoor units with horizontal construction designed for installation ● Electromagnetic Compatibility Directive 2014/30/EU (EMC) indoors, connected to a network of ducts. ● Low Voltage Directive 2014/35/EU (LVD) • 1 circuit: ● Pressure Equipment Directive 2014/68/EU (Category 2) (PED) Models: 90 / 100 / 120 / 160 / 180 / 182 ●...
  • Page 4: Available Assemblies

    3 - AVAILABLE ASSEMBLIES 40ZS/ZF - 90 to 360: assemblies with mixing box (plan view) Mwxyz Air circulation Designation Outlet Return Assembly: Return: Supply: Fresh air: Fresh air intake 0 = Standard 1 = Rear 1 = Front 1,6 = Rear Air extraction 2 = Top 2 = Top...
  • Page 5: Unit Identification

    PSmax(BP\LP) Temp. Max./ IP Peso\Poids\Weight NoBo Maximum service pressure in the high pressure side (R-410A = 42 bar) CARRIER SCS Fabricante\Fabricant\Manufacturer: Route de Thil Compañía Industrial de Aplicaciones Térmicas, S.A. Maximum service pressure in the low pressure side 01122 Montluel-FRANCE P.
  • Page 6: Coordinates Of The Centre Of Gravity

    5 - TRANSPORT AND HANDLING The unit must be lifted and fi xed with care, with maximum inclination of 15º, since it could harm its operation. Do not raise by points outside of those specifi ed here. 5.3 Coordinates of the centre of gravity 40ZS/ZF - 90 to 360 Centre of gravity (mm) Weight...
  • Page 7: Positioning And Installation

    6 - POSITIONING AND INSTALLATION 6.1 Choice of location When choosing the location, whatever may be the selected mounted to hide the unit, leaving a register cover to perform fashion, the following precautions have to be taken into the maintenance and fi lter cleaning operations. consideration: The fi...
  • Page 8: Anchorage For Silent-Blocks

    6 - POSITIONING AND INSTALLATION 6.3 Anchorage for silent-blocks 40ZS/ZF - 90 to 360 40ZS/ZF - 420 to 600 40ZS/ZF (mm) (mm) 90 to 120 1.146 160 and 180 1.476 182 to 240 2.100 320 and 360 2.760 420 to 600 1.300 2.061 6.4 Recommended service clearance for unit start-up and maintenance operations (mm) 40ZS/ZF - 90 to 360...
  • Page 9: Checking Before Commissioning

    7 - CHECKING BEFORE COMMISSIONING Importante: Nunca se debe poner en marcha el equipo sin haber leído previamente la totalidad del manual. 7.1 Electrical connections Installation norms Models 420 to 600 Access panel To perform the electric installation of the unit (cable glands, Electric cabinet conductor section and their calculations, protections, etc.), refer to the technical characteristic table provided in the technical...
  • Page 10: Checks In Plug-Fans (Optional)

    7 - CHECKING BEFORE COMMISSIONING For motors up to 15kW it is installed in the factory in the It is essential to tension the belts using the “Defl ection test” described below: auxiliary electric panel. For larger motors it is installed next to the ventilation group.
  • Page 11: Air Ducts Connections

    7 - CHECKING BEFORE COMMISSIONING 7.4 Air ducts connections The air supply and return ducts must be calculated in accordance with the rated fl ow and the unit’s available pressure (refer to the technical brochure of this series). The duct calculation and design must be made by qualifi ed technical personnel.
  • Page 12: Safety Elements

    8 - SAFETY ELEMENTS Main door switch Smoke detector (optional) In accordance with standard NF S B y u s i n g a m e c h a n i c a l 61-961, this smoke detection station device, it impedes access to uses a LED to indicate the installation the electric panel when the status, and if the probe detects the...
  • Page 13: Electrical Heaters

    9 - OPTIONS 9.2 Electrical heaters - The auxiliary electrical heaters are ready for operation in two To access the electrical heaters , the 2 screws that fasten the power stages. frame side panel must be unscrewed as shown in the following image: - The electrical heaters acquired with the unit will be incorporated to it modifying the electric panel in the factory,...
  • Page 14 9 - OPTIONS Kit assembly: Centrifugal fan (standard): When the frame with the electrical heaters is provided in a kit, 40ZS/ZF A follow the steps below for connecting it: 90 / 100 648 946 145 443 60 165 482 299 217 204 320 128 476 43 Step 1: lay down the frame on the panel to set the hole locations 648 946 113 443 92 115 482 349 167 204 370 96 476 75 that will fi...
  • Page 15 9 - OPTIONS Models 420 to 600 Supports attached Assembly and connection inside the unit. to the unit Kit assembly: When the frame with the electrical heaters is provided in a kit, follow the steps below for connecting it: Step 1: the electrical heaters are sent divided into 2 or 4 frames, depending on the required power, as shown in the following table: Total output (kW)
  • Page 16: Hot Water Coil

    9 - OPTIONS 9.3 Hot water coil Recomendations: Hot water coil for mounting inside the unit, with a 3-way valve managed by the unit’s electronic control. - Coil fi lling: Two types of water coils are availables: • The coil fi lling must be made with the bleeder valve open - Nominal coil for heating in cooling-only units.
  • Page 17: Filters

    9 - OPTIONS 9.5 Filters All model types can substitute the fi ltering mesh that the units Modelos 40ZS/ZF 420 to 600 include regularly with G4 rating, mounted on the same frames. Creased opacimetric fi lters classifi ed F6 to F9 can also be added. For taking out the fi...
  • Page 18: Maintenance

    10 - MAINTENANCE Air fi lters The minimal maintenance operations and their periodicity will be made in accordance with national regulations. - Clean regularly. Depending on the installation conditions, All work on the unit’s electrical or refrigerant systems must the fi lter aspect must be examined to defi ne the cleaning be carried out by a qualifi...
  • Page 19: Final Shutdown

    11 - FINAL SHUTDOWN 11.1 Shutting down 11.4 Materials to be recovered for recycling Separate the units from their energy sources, allow them to cool ● Steel then drain them completely. ● Copper ● Aluminium 11.2 Recommendations for disassembly ● Plastics ●...
  • Page 20 Order No.: 10259, 12.2020. Supersedes order No.: 07.2019 Manufactured for CARRIER in Spain. Manufacturer reserves the right to change any product specifi cations without notice. Printed in the European Union.

This manual is also suitable for:

40zf series

Table of Contents