Enterasys SecureStack C2 C2G124-24 Hardware Installation Manual page 65

Gigabit and fast ethernet switches
Table of Contents

Advertisement

Figure 4-3
LANVIEW LEDs (Continued)
LED
Color
UP
Off
Green
Manager
Off
Green
RPS
Off
Amber
State
No valid connection to switch stackdown
connector.
Solid. Valid connection to switch stackdown
connector.
Blinking. Information is being transferred via the
high-speed stacking cable.
Switch is operating as a Member in the stack.
Solid. Switch is operating as the Manager of the
stack.
RPS not in use.
Internal power supply failure.
Solid. The switch internal power supply failed,
and the RPS is providing the proper power to the
switch.
Recommended Action
1.
Make sure the switch connected to
the stackdown connector is powered
on.
2.
Replace cable with a known good
one.
3.
If the problem still exists, contact
Enterasys Networks for technical
support.
None.
None.
None.
None.
If an RPS is connected to the switch and
should be providing power, perform the
following:
1.
Ensure the RPS is powered on.
2.
Ensure that the AC power cord to the
RPS is plugged in correctly and that
there is power at the AC power
source.
3.
Replace the power cord with a known
good one.
4.
Ensure the DC power cord from the
RPS to the switch is plugged in
correctly.
5.
If the problem persists, contact
Enterasys Networks for technical
support.
None.
SecureStack C2 Installation Guide 4-5

Advertisement

Table of Contents
loading

Table of Contents