Siting And Transport Requirements; Transport; Installation Room Requirements; Minimum Clearances - Viessmann AC-Box Installation And Service Instructions For Contractors

Pre-assembled unit for implementing the natural cooling and active cooling functions in conjunction with brine/water heat pumps up to 17 kw
Table of Contents

Advertisement

Preparing for installation
Hydraulic connection with AC-Box connection...
Primary circuit connection line: Heat pump brine
R
outlet
Heat pump
S

Siting and transport requirements

Transport

!
Please note
Impacts, compression and tensile loads can
cause damage to the outside panels of the
appliance.
Never apply loads/weight to the top, front or
side panels of the appliance.

Installation room requirements

!
Please note
Unfavourable ambient conditions can lead to
malfunction and appliance damage.
The installation room must be dry and free
from the risk of frost.
Ensure ambient temperatures between 0 and
35 °C.
Danger
Dust, gases and vapours can be damaging to
health and cause explosions.
Avoid dust, gases and vapours in the installation
room.

Minimum clearances

A
B
400
Fig.3
AC-Box
A
Heat pump
B
8
200
400
(cont.)
!
Please note
Overloading the floor can result in damage to
the building structure.
Observe the permissible floor load. Take the
total weight of the appliance into account.

Advertisement

Table of Contents
loading

Table of Contents