Preparing For Installation Clearance Dimensions; Thermal Insulation Components - Viessmann Vitoplex 100 Installation Instructions For Contractors

Oil/gas boiler
Table of Contents

Advertisement

Clearance dimensions
200 (100)
500 (50)
400
(300)
500 (50)
Fig. 1
e
Fig. 2
Boiler
A
Burner
B
Anti-vibration boiler supports (accessories)
C
Rated heating output
a
*1
b
Anti-vibration boiler supports
Permissible load
c (front) / number
c (back) / number
d
e (unstressed)
e (stressed)

Thermal insulation components

The thermal insulation and casing are supplied in 2
packs. The following is a list of the components in the
individual packs.
*1
This space must be left clear in front of the boiler to facilitate the extraction of turbulators and for cleaning the hot gas flues.
6
b
a
kW
mm
mm
kg
mm/pce
mm/pce
mm
mm
mm
Dimensions in brackets are minimum clearances.
780
950
1120
1650
2150
Observe the installed burner length
3000
750/2
750/2
30
1350
1700
2400
4668
6004
667/2
834/2
500/2
667/2
100
100
42
37
2000

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pv1b 780

Table of Contents