Page 1
Rheem furnace application. The G961DAJ responds to inputs from the thermostat, limit switch(es), pressure switch, flame sensor, and power supply. The G961DAJ provides outputs for timing and sequencing of the main gas valve, induced draft motor, indoor blower motor, electronic air cleaner, humidifier, and spark igniter.
Page 2
LP gas-air mixture Agency Approvals IAS (AGA, CGA) Agency Test Standards ANSI Z21.20, CAN/CSA-C22.2 No. 199 * Timings based on 60 Hz operation. Timings increase 20% for 50 Hz operation. 2 G Gas Combustion Combination Controls and Systems—G961DAJ Integrated Function Ignition Control...
Sequence of Operation Call for Heat Upon receiving a call for heat from the system thermostat, the G961DAJ follows this normal sequence of operation: 1. Pressure Switch Detection--The control checks the inducer pressure switch to ensure that it is open.
Page 4
A pressure switch within the appliance provides proof of combustion air Detection flow. During a heating cycle, the G961DAJ control responds to the state of this switch in the following ways: 1. If the pressure switch is not open at the beginning of the heating cycle, the control will wait for the switch to open.
Page 5
The twinning connection forces the blowers of each furnace to operate synchronously into a common duct system. Normal Operation Upon receiving a call for heat (or cool), the controls simultaneously perform the normal operating sequences detailed previously. G—Gas Combustion Combination Controls and Systems—G961DAJ Integrated Function Ignition Control 5...
Johnson Controls ignition controls. Carefully follow all instructions on this sheet and all instructions on the appliance. Limit repairs, adjustments, and servicing to the operations listed in this sheet or on the appliance. 6 G Gas Combustion Combination Controls and Systems—G961DAJ Integrated Function Ignition Control...
Page 7
Choose a location with the shortest direct cable route to the spark igniter and flame sensor. To wire the G961DAJ, follow the schematic in Figure 1. All wiring should be in accordance with the National Electrical Code (NEC) and all other local codes and regulations. The high voltage spark cable must not be in continuous contact with a metal surface.
Page 8
Figure 1: Wiring Diagram for G961 8 G Gas Combustion Combination Controls and Systems—G961DAJ Integrated Function Ignition Control...
Are all mechanical and electrical connections tight? Is system wired correctly? Is gas inlet pressure per manufacturer’s specifications? Is system powered? Is thermostat calling for heat? G—Gas Combustion Combination Controls and Systems—G961DAJ Integrated Function Ignition Control 9...
Maximum number of flameouts exceeded Check/correct gas pressure, drafts, low flame sense current. Flame sensed when gas valve is Check for leaking or slow closing gas valve de-energized and replace where necessary. 10 G Gas Combustion Combination Controls and Systems—G961DAJ Integrated Function Ignition Control...
Do not attempt field repairs to the ignition control. Use only an exact or recommended replacement control. For a replacement control or accessories, contact the original equipment manufacturer or authorized wholesaler. G—Gas Combustion Combination Controls and Systems—G961DAJ Integrated Function Ignition Control 11...
Page 12
Notes Controls Group FAN 121 507 E. Michigan Street Installation Sheets Manual P.O. Box 423 Printed in U.S.A. Milwaukee, WI 53201 12 G Gas Combustion Combination Controls and Systems—G961DAJ Integrated Function Ignition Control...