How to Check this Installation Procedure
Symbols in the Illustration
The frequently-performed operations are described with symbols in this procedure.
Screw
1x
Unused Parts
Packaged Item
Install
Harness
Connector
(Common for Guides and Clamps)
1x
1x
1x
Connect
Remove
Install
Power
Check the sound
Check visually
ON
OFF
Check Items when Turning OFF the Main Power
Check that the main power switch is OFF.
1) Turn OFF the main power switch of the host machine.
2) Be sure that Control Panel Display and Main Power Lamp are both turned OFF, and then
disconnect the power plug.
6
Installation_Super G3 FAX Board-AR1 > Installation Outline Drawing
Installation_Super G3 FAX Board-AR1
1x
1x
1x
Tighten
Loosen
Remove
Power Cord
1x
Connect
Disconnect
Disconnect
Check
Push
Cleaning
6
Installation_Super G3 FAX Board-AR1 > Installation Outline Drawing
Installation_Super G3 FAX Board-AR1
Points to Note at Installation
• When installing this equipment and the Super G3 2nd Line Fax Board-AR1 at the same
time, be sure to start from "Installation Procedure > Installing the Fax Board" of Super G3
2nd Line Fax Board-AR1 Installation Procedure.
• Although pictures or illustrations used for explanation may differ from the actual things, the
procedure is the same.
CAUTION: Marked portion
When tightening the screws, do not tighten them too tightly. Otherwise, there is a risk
of damage and deformation of screw holes.
Installation Outline Drawing
F-6-1
6-2
F-6-2
F-6-3
6-2