7. PWR BD board must check the height of soldering tin
This step needs check connector and boss height.
A piece of screw*1pcs needs dress.
Screw*1pc
8. The assembly of OPE and LC
This step needs screw/8F.VA564.7R0*3pcs to tighten.
And the sequence needs obey according to picture.
For EMI, the rubber power is necessary.
This cord direction should like this
59